The description that is pre loaded into this activity is out of date, Testing & maintenance of security system, including detectors, cameras, panels etc. Related Bulletin: Building Bulletin 69: Specification, Installation & Maintenance of ...
As we create many projects for long term, allow a box on the central projects list to only view "Live" projects. This would allow us to not only see just those we need to centrally, but also manage overall costs, allocations etc
When running reports from the compliance matrix, would it be possible to show the "done awaiting paperwork in a different colour so that it can be filtered separately in excel.
I think a copy and paste feature should be added for checklists, As i have found if i were to make a firedoor checklist for the fire door checks. I would have to write out over 100 separate sections of the same thing where it could just be copy an...
The ability to turn activities that are 'completed-awaiting documents' amber.
Currently, when an activity is awaiting documentation, the colour is red or green. Green makes it look completed and that there is nothing outstanding, whereas red makes it appear as if the activity has not been completed. This has created a lot o...
For each new session, we do have the same programmes and papers. Add an option to clone papers/programmes between sessions, this could be placed after the Edit and Archive options at the right side of each paper.
Facility to create additional fields within the Every business activities.
If there was an option to create additional fields, for example activity specific instructions, sequence of works or any other relevant information, this could make the delivery of the activity more efficient.
Contracts that are set to automatically rollover should not require manual intervention the keep changing the date. Is there a way for the system to recognise that the contract is set to automatically rollover to the renewal date specified when th...