As we create many projects for long term, allow a box on the central projects list to only view "Live" projects. This would allow us to not only see just those we need to centrally, but also manage overall costs, allocations etc
Ability to run full property reports on performance reviews.
Head Teacher/ CEO / Trustees can see a full report within a property that shows all the answers to performance reviews and links with objectives. Instead of individually clicking and downloading every review which is incredibly time consuming.
I think a relatively simple update would be improving the layout of the weekly notification emails. Currently most staff ignore them because it's just a wall of small text and nothing stands out. If the sections could be separated into boxes with ...
It would be good to see which users log onto Every and which dont. I know that you can see per user, but with schools that have around 100 staff, going into each user report isnt do-able. It would be good to have a page / table that shows all user...
Currently the custom report builder does not link to performance module so you cannot run any custom reports. Adding in this link to performance module would massively improve the reports produced for performance module.
When running reports from the compliance matrix, would it be possible to show the "done awaiting paperwork in a different colour so that it can be filtered separately in excel.
I think a copy and paste feature should be added for checklists, As i have found if i were to make a firedoor checklist for the fire door checks. I would have to write out over 100 separate sections of the same thing where it could just be copy an...
Changing an activity description at MAT level should also change at property level
We set our own descriptions on our MAT, if I were to change a description at MAT level. It doesn't take effect at school level even though they are mapped. This then means you have to go into each property and change each description seperately.